The work involved the construction of a two-lane viaduct rising in an overpass in the Panamericana Norte Highway that passes over Av. Habich. This viaduct is 273.92 m long, and it has access ramps on both sides; the ramp on the south side is 313.60 m long and that on the north side is 176.25 m long.